ENGINEERING & CONSTRUCTION AT IT'S BEST

Learn more about us & DOWNLOAD our CATALOGUE

Zubair Temporary Compression Project

Client :

BGC/Shell

End User:

Midland Oil Company

Location:

Zubair, Basra

Scope :
-> Leveling
-> Earth Works
-> Fabrication.
-> Construction and installation of a number of civil structures designed to support Zubair Temporary compression facilities
Start Date :

20 May 2014

Finish Date :

13th Oct 2014

Degassing Modification Project

Client :

STX Heavy Industries Co. Ltd 

End User:

Midland Oil Company

Location:

Zubair, Basra

Scope :
-> Supply and Installation of Temporary Facility for Iraq Zubair Existing DGS Modification Project. 
Start Date :

November 2012

Finish Date :

September 2014

Radisson SAS Hotels & Resorts

Name:  

Radisson SAS Hotels & Resorts

Scope:  Construction of the Eastern Cone of the 5 Star hotel with 250 guest rooms & suites and 2 restaurants in Alex West which is a new suburb of 600 acres overlooking Marout Lake, located 20 minutes drive to the west of Alexandria on Mehwar highway
Start Date:

August 2006

Finish Date:

November 2007

2
1

Benban Solar Park

Name:  

Benban Solar Park

Location: 

Aswan in Egypt

Scope:   Albilal Group is the lead developer of this project. Albilal Group. The project is supported by a 25-year Power Purchase Agreement (PPA) with the Egyptian Electricity Transmission Company (EETC). The objective of the project is to contribute to increasing Egypt’s generation capacity, and reducing Egypt’s dependency on gas and fuel for electricity generation.
Size Of Plant

25 MW p

Flagship Project

Client :

STX

End User:

Eni

Oilfield:

Zubair

Classification:

Brownfield

Name :

Modification
of 3x Degassing Stations 

Scope :
-> Site Preparation
-> Temporary Facilities
-> Civil Works
-> Mechanical Works
-> Piping works
-> Electrical Works
-> Instrumentation Works
-> Commissioning
Start Date :

29 May 2016

Finish Date :

December 2017

 
Client :

Gazprom Neft Badra B.V

End User:

Midland Oil Company

Oilfield:

Badra, Wassit

Classification:

Greenfield

Name :

Engineering,
Procurement and Construction  (EPC)
contract for Water Supply System from Fresh Water Wells to Central Processing
Facility (CPF)

Scope :
-> Detailed Engineering,
-> Earth Works
-> Fabrication.
-> Pre-Commissioning and Commissioning works
Start Date :

29 May 2016

Finish Date :

December 2017

 
Client :

Lukoil Middle East

End User:

BOC (Basra Oil Company)

Oilfield:

West Qurna – Phase 2

Classification:

Brownfield

Name :

Zubair North New Degassing Station Project

Scope :

Construction Works For Damam Water Injection System a Follows:

-> Civil Works
-> Structural Works
-> Piping Fabrication & Erection
-> Electrical & Control System Installation
-> Oil Wells Hookups
-> Pre-Commissioning
-> Start-up & Operational Support
Start Date :

August 2016

Finish Date :

December 2018

 
Client :

SAMSUNG ENGINEERING

End User:

Eni/Oxy/Missan / Kogas

Oilfield:

Zubair, Basrah, Iraq

Classification:

Greenfield

Name :

Zubair North New Degassing Station Project

Scope : Substation Building Works including Civil, HVAC, Fire fighting, E&I Works
Start Date :

January 2015

Finish Date :

August 2017

 
Client :

Basra Gas Company (BGC)

End User:

BGC

Oilfield:

Zubair

Classification:

Brownfield

Name :

Zubair
Temporary Compression Station

Scope :
-> Site Preparation
-> Civil Works
-> Mechanical Works
-> Piping works
-> Electrical Works
-> Instrumentation Works
Start Date :

May 2014

Finish Date :

February 2015

 
Client :

STX

End User:

Ministry of Electricity

Location:

Missan

Name :

Amara 500 MW GTPP

Scope :
-> Site Preparation
-> Temporary Facilities
-> Civil Works
-> Mechanical Works
-> Electrical Works
-> Testing & Commissioning
Start Date :

February 2013

Finish Date :

November 2015

Client :

Ministry of Electricity (MoE)

End User:

Ministry of Electricity

Location:

Missan

Name :

Buzurgan 120 MW GTPP

Scope :

EPC (Turn-key)

Start Date :

July 2011

Finish Date :

February 2014

 
Client :

Ministry of Electricity (MoE)

End User:

Ministry of Electricity

Location:

Najaf

Name :

Najaf  55.3 MW GTPP

Scope :

Construction ,Testing and
Commissioning

Start Date :

Sep  2011

Finish Date :

Jan 2013

 
Client :

STX HI

End User:

Ministry of Electricity

Location:

Maysan

 

Name :

Maysan 200  MW DG  Power Plant

Scope :

Construction ,Testing and
Commissioning  of 4 MW X 48 Unit  Diesel engine set

Start Date :

Nov 2011

Finish Date :

June 2012 

 
Client :

Basra Gas Company (BGC)

End User:

BGC

Oilfield:

Qurainat

Classification:

Greenfield / Brownfields

Name :

Qurainat
Temporary Compression Station

Scope :
-> Site Preparation
-> Civil Works
-> Mechanical Works
-> Piping works
-> Electrical Works
-> Instrumentation Works
Start Date :

Feb 2015

Finish Date :

Dec 2015

 
Client :

CMS ENERJI A.S/ GE

End User:

MOE

Location:

Al- Diwaniyah, Iraq

Name :

Diwaniyah 4 x GE Frame 9E

Scope :

HFO Treatment
Plant for Al-Diwaniyah Power Plant

Start Date :

Finish Date :

Jan 2017